
Talasa Terra - Apartments
El Verger, Costa Blanca North
Talasa Terra - Apartments
Description
Talasa Terra - Apartments is a new build development in El Verger, on the Costa Blanca North, with panoramic views of the sea and the mountains. It is the second development within a larger whole and is currently under construction. Sustainability is central: it will get systems for collecting and reusing rainwater, gardens with native species and charging points for electric vehicles.
This is the second development within a larger scheme, and the homes currently for sale belong to its first phase. The layout is based on communal areas accessible to all residents, while each home, according to the developer, also has its own private space, both indoors and outdoors.
According to the developer, the communal areas are being laid out for walking, sport and above all cycling. As construction is currently under way, these areas still have to be created. The development is a few kilometres from Denia.
The available homes have two or three bedrooms.
Specifications
- Reference
- CSNB-1238
- Region
- Costa Blanca North
- Town
- El Verger
- Status
- Under construction
- Bedrooms
- 2–3
- Bathrooms
- 2
- Living area
- 66.7–96.61 m²
Amenities
Payment plan
Documents
Receive the brochure, price list and floor plans straight to your inbox.
- Brochure
- Price list
- Floor plans
Spanish know-how, personal approach.
We reply within one working day
Available homes
Grouped by type. Open a group for the individual units with floor plan.
Other projects that may suit you
Frequently asked questions about new-build
- Bank guarantee on your depositEvery deposit for a home under construction is covered by a legal bank guarantee. If the developer fails to deliver, your money is refunded.
- Ten-year insurance (seguro decenal)New-build comes with a mandatory ten-year insurance against serious structural defects.
- Independent adviceWe work for you, not the developer. Your own lawyer checks every contract before you sign.
Usually you pay a reservation, then a portion at the notarial deed of sale, and the remainder on completion. The exact schedule is shown per project under “Payment schedule”.
Request information about this development
Leave your details and we'll be in touch personally within one working day.
Keep looking



