
Be Grand El Limonar
Limonar, Costa del Sol
Be Grand El Limonar
Description
Be Grand El Limonar is a new build development in Limonar on the Costa del Sol, with available apartments and duplexes. The project is under construction and will have parking spaces with electric vehicle charging. According to the developer it is a short walk from the beach, and the development offers sea views and panoramic views.
The project is located between Paseo de Salvador Rueda and Calle Ramal de Monte Sancha. Construction is currently underway. According to the developer, the homes will be delivered with high-quality finishes; the developer does not provide further details about the materials or the layout.
The available offer consists of apartments and duplex homes. The available homes have two or three bedrooms. Living areas range from 93.05 m² to 178.23 m², which means the differences between the smallest and the largest available home are considerable.
The grounds will include two swimming pools with panoramic views.
Specifications
- Reference
- CSNB-798
- Region
- Costa del Sol
- Town
- Limonar
- Status
- Under construction
- Bedrooms
- 2–3
- Bathrooms
- 2–4
- Living area
- 93.05–178.23 m²
- Delivery
- 2027-Q1
Amenities
Delivery
Documents
Receive the brochure, price list and floor plans straight to your inbox.
- Brochure
- Price list
- Floor plans
No sales pressure, just independent advice.
We reply within one working day
Available homes
Grouped by type. Open a group for the individual units with floor plan.
Other projects that may suit you
Frequently asked questions about new-build
- Bank guarantee on your depositEvery deposit for a home under construction is covered by a legal bank guarantee. If the developer fails to deliver, your money is refunded.
- Ten-year insurance (seguro decenal)New-build comes with a mandatory ten-year insurance against serious structural defects.
- Independent adviceWe work for you, not the developer. Your own lawyer checks every contract before you sign.
Usually you pay a reservation, then a portion at the notarial deed of sale, and the remainder on completion. The exact schedule is shown per project under “Payment schedule”.
Request information about this development
Leave your details and we'll be in touch personally within one working day.



