
RESIDENCIAL EL PASICO - Fase 3
Torre-Pacheco, Costa Cálida
RESIDENCIAL EL PASICO - Fase 3
Description
RESIDENCIAL EL PASICO - Fase 3 is a new build development in Torre-Pacheco on the Costa Cálida, with available single-storey villas. According to the developer, each villa gets a private pool, a solarium and an open living area with a fitted kitchen. The development sits close to golf, shops and the town centre, and the homes get private parking on the plot.
The villas in this phase are built on a single level, so all living space is on the ground floor. According to the developer, each villa comes with its own pool and a solarium. The layout is contemporary, with an open plan in which the kitchen and the living-dining room form one space. The kitchen is delivered fully fitted.
Each villa has parking space on its own plot. The homes are prepared for air conditioning; the system itself is not included.
Two villas from this phase are currently for sale. The available villas have two or three bedrooms and a living area of 73.62 to 90.48 m².
The development is located near a golf course, shops and the centre of Torre-Pacheco.
Specifications
- Reference
- CSNB-562
- Region
- Costa Cálida
- Town
- Torre-Pacheco
- Status
- Under construction
- Bedrooms
- 2–3
- Bathrooms
- 2
- Living area
- 73.62–90.48 m²
- Delivery
- 2027-Q2
Amenities
Delivery
Payment plan
Documents
Receive the brochure, price list and floor plans straight to your inbox.
- Brochure
- Price list
- Floor plans
Spanish know-how, personal approach.
We reply within one working day
Available homes
Grouped by type. Open a group for the individual units with floor plan.
Other projects that may suit you
Frequently asked questions about new-build
- Bank guarantee on your depositEvery deposit for a home under construction is covered by a legal bank guarantee. If the developer fails to deliver, your money is refunded.
- Ten-year insurance (seguro decenal)New-build comes with a mandatory ten-year insurance against serious structural defects.
- Independent adviceWe work for you, not the developer. Your own lawyer checks every contract before you sign.
Usually you pay a reservation, then a portion at the notarial deed of sale, and the remainder on completion. The exact schedule is shown per project under “Payment schedule”.
Request documentation
Leave your details and we will email you the documentation.
Keep looking



