
Montañosa
Hondon de las Nieves, Costa Blanca South
Montañosa
Description
Montañosa is a new build development in Hondon de las Nieves, on the Costa Blanca South, with available detached villas. The villas sit in a quiet residential setting, yet within walking distance of shops and restaurants. According to the developer, the layout is divided into a day zone with an open-plan living space and kitchen, and a sleeping zone with a master bedroom with dressing room.
According to the developer, the layout of the available villas is set out in two zones. The day zone has a spacious living and dining room with an open kitchen; the kitchen furniture is included. Two large windows connect this space with the covered terrace outside. As an additional space there is a utility room, which according to the developer has been positioned in the floor plan so that it is easily accessible from anywhere in the house.
The sleeping zone contains three bedrooms. In addition to the walk-in wardrobe, the master bedroom also has its own bathroom. A second bathroom serves the other bedrooms and the rest of the home.
The available homes are detached and have three bedrooms. The development is currently under construction.
Specifications
- Reference
- CSNB-1152
- Region
- Costa Blanca South
- Town
- Hondon de las Nieves
- Status
- Under construction
- Bedrooms
- 3
- Bathrooms
- 2
- Living area
- 108–129 m²
Amenities
Payment plan
Documents
Receive the brochure, price list and floor plans straight to your inbox.
- Brochure
- Price list
- Floor plans
Spanish know-how, personal approach.
We reply within one working day
Available homes
Grouped by type. Open a group for the individual units with floor plan.
Other projects that may suit you
Frequently asked questions about new-build
- Bank guarantee on your depositEvery deposit for a home under construction is covered by a legal bank guarantee. If the developer fails to deliver, your money is refunded.
- Ten-year insurance (seguro decenal)New-build comes with a mandatory ten-year insurance against serious structural defects.
- Independent adviceWe work for you, not the developer. Your own lawyer checks every contract before you sign.
Usually you pay a reservation, then a portion at the notarial deed of sale, and the remainder on completion. The exact schedule is shown per project under “Payment schedule”.
Request information about this development
Leave your details and we'll be in touch personally within one working day.
Keep looking



