
Mar de Pulpí Phase 9 - Petunia
Pulpí
Mar de Pulpí Phase 9 - Petunia
Description
Mar de Pulpí Phase 9 - Petunia is a new build development in Pulpí with available apartments. The project forms part of a larger residential scheme and is currently under construction, with completion planned for the fourth quarter of 2026. Residents share an outdoor pool, a children's pool, a playground and communal gardens; the site is gated and has a lift, garage and storage room.
Petunia is the ninth phase of a larger residential area. This phase comprises 366 homes. According to the developer, these are apartments with one, two or three bedrooms and one or two bathrooms, spread across three floors.
The outdoor space differs per floor. The ground-floor homes have a private garden with a spacious covered terrace. The homes on the first floor come with a large terrace. The homes on the second floor have their own solarium. According to the developer, each home includes pre-installation for air conditioning and a parking space.
The available offering consists of apartments from 67 to 169 m². Walking paths with native planting run through the residential area. Opposite the residential area are the beaches La Entrevista and Los Nardos, and Águilas is a few minutes' drive away.
Specifications
- Reference
- CSNB-434
- Town
- Pulpí
- Status
- Under construction
- Bedrooms
- 1–3
- Bathrooms
- 1–2
- Living area
- 67–169 m²
- Delivery
- 2026-Q4
Amenities
Delivery
Documents
Receive the brochure, price list and floor plans straight to your inbox.
- Brochure
- Price list
- Floor plans
No sales pressure, just independent advice.
We reply within one working day
Available homes
Grouped by type. Open a group for the individual units with floor plan.
Other projects that may suit you
Frequently asked questions about new-build
- Bank guarantee on your depositEvery deposit for a home under construction is covered by a legal bank guarantee. If the developer fails to deliver, your money is refunded.
- Ten-year insurance (seguro decenal)New-build comes with a mandatory ten-year insurance against serious structural defects.
- Independent adviceWe work for you, not the developer. Your own lawyer checks every contract before you sign.
Usually you pay a reservation, then a portion at the notarial deed of sale, and the remainder on completion. The exact schedule is shown per project under “Payment schedule”.
Request documentation
Leave your details and we will email you the documentation.
Keep looking



