
Edificio Vento II
Torrevieja, Costa Blanca South
Edificio Vento II
Description
Edificio Vento II is a new build development in the heart of Torrevieja, on the Costa Blanca South, with available apartments. Torrevieja is a real town with a boulevard, markets and amenities that are open all year, with the pink salt lakes as a backdrop. According to the developer, most of the homes are fully exterior and electric underfloor heating is fitted in the bathrooms.
Eleven of the homes are currently for sale. These are apartments with one or two bedrooms, with a living area of 48.99 to 72.17 m².
According to the developer, the floor plans are functional and contemporary in layout, aimed at making the best possible use of the space. According to the developer, each home will have its own terrace.
High-quality materials are used for the construction, with joinery and finishes from a higher segment. The architecture keeps to clean, straight lines.
Specifications
- Reference
- CSNB-836
- Region
- Costa Blanca South
- Town
- Torrevieja
- Status
- Under construction
- Bedrooms
- 1–2
- Bathrooms
- 1
- Living area
- 48.99–72.17 m²
- Delivery
- 2028-Q4
Amenities
Delivery
Payment plan
Documents
Receive the brochure, price list and floor plans straight to your inbox.
- Brochure
- Price list
- Floor plans
Spanish know-how, personal approach.
We reply within one working day
Available homes
Grouped by type. Open a group for the individual units with floor plan.
Other projects that may suit you
Frequently asked questions about new-build
- Bank guarantee on your depositEvery deposit for a home under construction is covered by a legal bank guarantee. If the developer fails to deliver, your money is refunded.
- Ten-year insurance (seguro decenal)New-build comes with a mandatory ten-year insurance against serious structural defects.
- Independent adviceWe work for you, not the developer. Your own lawyer checks every contract before you sign.
Usually you pay a reservation, then a portion at the notarial deed of sale, and the remainder on completion. The exact schedule is shown per project under “Payment schedule”.
Request information about this development
Leave your details and we'll be in touch personally within one working day.
Keep looking



